On my merge quiries, I created calculation between two queries. As default all calculation are placed at the very last column of the table.
I would like to ask if there is anyway I can move my calculation column at least in between of my 2 queries.
Thank you
If you select Table visualisation type then in the visualisation itself you are able to move the field in between other fields or anywhere because the visualisation engine in Table vis no longer cares if the column is measure, dimension, or table calculation
Here I moved my test Table calculation before the dimension: